August 3, 2010 - 3rd Alarm - 155 Catalina Dr.
August 3, 2010 - 2:53pm - East Command - "C" Shift
Flames were spreading up the back of this large single storey brick bungalow from the well involved basement when crews arrived. Several lines were deployed as the blaze got into the roof space and eventually broke through in several areas. A215's ladder pipe was deployed and lots of overhaul followed in hot, muggy weather. The cause of the $500,000 outbreak is being looked into.
1st Alarm 1453: P234, P223, R231, A215, C23
2nd Alarm 1501: P215, P212, R214, R225 (RIT), A244, A/L333, S232, HZ332, C22
Additional 1502: C20, CMD10
Replacement 1504: R224 (RIT)
Replacement 1509: CMD30
Additional 1515: SUP7
3rd Alarm 1533: P213, R225 (RIT), R243, A226, C21
Replacement : P244
* R224 replaced R225 on the 2nd alarm, then R225 was assigned on the 3rd alarm
P244 replaced R243 on the 3rd alarm after R243 had a mechanical breakdown enroute
Read MoreFlames were spreading up the back of this large single storey brick bungalow from the well involved basement when crews arrived. Several lines were deployed as the blaze got into the roof space and eventually broke through in several areas. A215's ladder pipe was deployed and lots of overhaul followed in hot, muggy weather. The cause of the $500,000 outbreak is being looked into.
1st Alarm 1453: P234, P223, R231, A215, C23
2nd Alarm 1501: P215, P212, R214, R225 (RIT), A244, A/L333, S232, HZ332, C22
Additional 1502: C20, CMD10
Replacement 1504: R224 (RIT)
Replacement 1509: CMD30
Additional 1515: SUP7
3rd Alarm 1533: P213, R225 (RIT), R243, A226, C21
Replacement : P244
* R224 replaced R225 on the 2nd alarm, then R225 was assigned on the 3rd alarm
P244 replaced R243 on the 3rd alarm after R243 had a mechanical breakdown enroute
- No Comments
** All photos / video are the property of the photographer * For use of photos / purchase of prints (including media use) please contact us at torontofirepics@gmail.com **