October 22, 2011 - 2nd Alarm - 19 Goodwill Ave.
October 22, 2011 - 5:02am - North Command - "C" Shift
First in crews arrived to a 2-storey house under construction and found it fully involved. Firefighters assumed a defensive position and laid lines to protect exposures. Despite their efforts, flames extended into the wall of the east exposure, as well as melting much of the vinyl siding. Embers also ignited a roof fire at 11 Goodwill Ave. The blaze was finally brought under control with several hand lines and T331's master stream.
1st Alarm 0502: P132, P143, S143, A131, C13
Additional 0505: P145
2nd Alarm 0507: P121, R133, R112, R122(RIT), A133, A/L114, HZ145, C14
Additional 0508: C10, CMD10
Additional 0520: P142, P135, R341
Additional 0530: T331, P114
Read MoreFirst in crews arrived to a 2-storey house under construction and found it fully involved. Firefighters assumed a defensive position and laid lines to protect exposures. Despite their efforts, flames extended into the wall of the east exposure, as well as melting much of the vinyl siding. Embers also ignited a roof fire at 11 Goodwill Ave. The blaze was finally brought under control with several hand lines and T331's master stream.
1st Alarm 0502: P132, P143, S143, A131, C13
Additional 0505: P145
2nd Alarm 0507: P121, R133, R112, R122(RIT), A133, A/L114, HZ145, C14
Additional 0508: C10, CMD10
Additional 0520: P142, P135, R341
Additional 0530: T331, P114
- No Comments
** All photos / video are the property of the photographer * For use of photos / purchase of prints (including media use) please contact us at torontofirepics@gmail.com **